Help on Disaster recovery for ERP system within 2-3 hours using Virtualization

Home Forums Virtualization VMware Virtualization Help on Disaster recovery for ERP system within 2-3 hours using Virtualization

Viewing 1 post (of 1 total)
  • Author
    Posts
  • Avatar
    nguyennp
    Member
    #166665

    We have ERP system has operated for nearly 9 years, including:
    * 1 ERP01 name server running on Windows Server 2003 Standard 32bit (due to not upgraded ERP, have to use old Windows) – physical
    * 1 server named SQL01 SQL Server 2005 running on 64-bit Windows 2008 R2 Standard – physical There’re also 2 Domain Controllers.

    We would like to have online systems, ie 1 in 2 server is corrupted, the system should still run or downtime is within 2-3 hours. With the old operating system then I think can use only virtualization. We don’t want to change much on the system. For no downtime, I think no way as the ERP application itself doesn’t support, and old OS, old SQL Server, etc … Can you advise what is solution that we can apply to get the downtime within 2-3 hours ?

Viewing 1 post (of 1 total)

You must be logged in to reply to this topic.